• masterofn001
    link
    fedilink
    arrow-up
    27
    ·
    1 month ago

    I’m gonna take a guess without watching and say:

    Because freight company CP owns the lines people use riding Via.

    And the various governments for decades have done nothing about anything to make rail better.

    • pedz
      link
      fedilink
      arrow-up
      23
      ·
      1 month ago

      Actually, Canada is a leader in high speed rail studies.

      • FireRetardant@lemmy.world
        link
        fedilink
        arrow-up
        10
        ·
        1 month ago

        I may be wrong but I recall learning somewhere that the recent rail project used the UK and Australia as a study for it. Neither of these countries are known for amazing high speed rail. Why didn’t we look at Japan, France, Spain, or other countries that have world renowned high speed rail, high ridership rates, and good frequency?

        The the time to build this rail was decades ago, lets use some of the most successful examples to study so we can catch up and build a modern system instead of building something that is already outdated.

    • kent_eh
      link
      fedilink
      English
      arrow-up
      7
      ·
      1 month ago

      VIA operates on CN tracks in the west, but that doesn’t negate the overall correctness of your statement.

      They’re always late because they don’t own the infrastructure and have to take a back seat to their "landlord’s " schedule.

    • humanspiral
      link
      fedilink
      arrow-up
      2
      arrow-down
      1
      ·
      1 month ago

      The way to get the highest score in railroad tycoon (classic game) is to prioritize the mail and passenger trains. Government could pay CN to let VIA prioritize traffic.