The train is expected to use a newly built, separate electrified track and run frequently. In addition to Quebec City, Montreal and Toronto, it would serve Trois-Rivières, Laval, Ottawa and Peterborough.

Transport Canada initially estimated that the cost of a high-speed rail link between the two cities could be as high as $80 billion.

It’s expected to take four to five years to design the future high-speed line. Funds are to be allocated at the end of that time period, so it’s possible a future government could modify or cancel the project.

  • CanadianCorhen
    link
    fedilink
    arrow-up
    4
    ·
    3 days ago

    Fair enough, but we need to start where the density already is.

    Once we have it here, and maybe have grown the expertise, we can grow the system.