Meanwhile, the employers—Otis, Schindler, KONE and TK Elevator—have served a lockout notice that could come into effect on Tuesday.

      • Pyr_Pressure
        link
        fedilink
        arrow-up
        15
        ·
        1 year ago

        And then we need the same amount of workers to inspect and service the robot mechanics 🤣

    • bane_killgrind@kbin.social
      link
      fedilink
      arrow-up
      4
      ·
      1 year ago

      The way that highrise formwork is put together, there would need to be massive expensive changes into the structure of these buildings to accommodate an automated solution.

      The elevator shafts are structural in a lot of cases, so opening it up at grade to bring in some automated equipment would mean the shaft needs lateral support.

      The installation robot itself would need to fasten it’s own rails into the shafts and walk up/down the shaft, installing factory built assemblies in each level, plug them into a common bus, all from a temporary power connection because it hasn’t plugged itself in at the top yet…

      Human installable takes a much cheaper BOM than machine installable.