• intrepid
    link
    fedilink
    arrow-up
    3
    arrow-down
    1
    ·
    8 months ago

    They should have thought of redundancy for the HLS. For one, you have a space fuel depot with cryogenic boil off that has to be refilled by multiple (at least 12?) starships. And then you have a slender long full rocket stage that has to land vertically on soft and unprepared lunar regolith. For some reason, my engineering instincts are revolting just at the thoughts of it.