• MystikIncarnate
    link
    fedilink
    English
    arrow-up
    8
    ·
    10 months ago

    Last I heard my old landlord/friend was massively renovating the place, he stripped it down to the studs and I think he even added another floor to the building. He was redoing everything. At the time he was waiting on a permit to continue the work. He was putting in the time and effort to modernize and reduce his efforts long term. Hopefully that works out for him.

    I hope your Tuesday delivery is smooth and that the new unit arrives undamaged in working order.

    All the best.