Firm predicts it will cost $28 billion to build a 2nm fab and $30,000 per wafer, a 50 percent increase in chipmaking costs as complexity rises::As wafer fab tools are getting more expensive, so do fabs and, ultimately, chips. A new report claims that

  • Earthwormjim91@lemmy.world
    link
    fedilink
    English
    arrow-up
    52
    ·
    edit-2
    1 year ago

    2nm process doesn’t actually mean 2nm though. Hasn’t in over a decade.

    The current 3nm process has a 48nm gate pitch and a 24nm metal pitch. The 2nm process will have a 45nm gate pitch and a 20nm metal pitch.

    “Nm” is just “generation” today. After 5nm was 3nm, next is 2nm, then 1nm. They’ll change the name after that even though they’re still nowhere near actual nm size.

    • weew
      link
      fedilink
      English
      arrow-up
      6
      ·
      1 year ago

      Intel already has plans to name the further generations xxA, after Angstroms

    • AA5B@lemmy.world
      link
      fedilink
      English
      arrow-up
      1
      ·
      edit-2
      1 year ago

      Yeah I’m a bit curious what the marketing will be as they have to get more vertical, 3D. Will there be naming to reflect that or will they just follow existing naming, 0.5nm?