• Nougat@kbin.social
    link
    fedilink
    arrow-up
    13
    ·
    1 year ago

    Ron Rienas, GM of the Buffalo and Fort Erie Public Bridge Authority, told ABC News all four Canada-U.S. bridges over the Niagara River have been closed out of an abundance of caution while the Rainbow Bridge investigation continues.

    • Rentlar
      link
      fedilink
      arrow-up
      2
      ·
      1 year ago

      Ok that sucks, but following the preliminary investigation if there are no significant findings, Lewiston, Whirlpool and Peace Bridge should open up not after long.