A high-speed rail line in California is chugging along towards 2030 debut::The state’s High-Speed Rail Authority will soon begin accepting proposals from electric train manufacturers ahead of a proposed 2030 debut.

  • gravitas_deficiency@sh.itjust.works
    link
    fedilink
    English
    arrow-up
    53
    arrow-down
    2
    ·
    edit-2
    1 year ago

    Once selected and constructed, the high-speed trains would top out at 242 mph while traversing a 171-mile starter segment connecting Central Valley’s Bakersfield and Merced

    Oh wow! In only 6.5 years, I’ll be able to get from 2/3 of the way to San Francisco to 3/4 of the way to Los Angeles very efficiently!

    I swear we’re going to be litigated into irrelevance with all this NIMBY idiocy.

    • Kbobabob@lemmy.world
      link
      fedilink
      English
      arrow-up
      18
      ·
      1 year ago

      That’s the easy stretch to complete. It’ll be another 15 to actually connect SF and LA.

      • TanakaAsuka@sh.itjust.works
        link
        fedilink
        English
        arrow-up
        9
        arrow-down
        1
        ·
        1 year ago

        But without main population centres is it going to be done successfully? Imo they should have started with one of the ends, so that at least there is a big trip destination.

        Too late for that now and I really hope it works out and we get a good example for north american high speed rail projects to point to despite everything.

        • MrSpArkle
          link
          fedilink
          English
          arrow-up
          4
          ·
          1 year ago

          They would be waiting forever if they wanted to break ground in downtown la or sf first.

          You can’t will car lobbies and nimbys to action, you have to coerce the general public and the state, and this incomplete rail will be the coercion.

          Honestly it’s a brilliant strategy for a shitty situation. After this phase, if they somehow don’t get permission to complete the line, they would never have gotten rail built between the cities anyway.

          • TanakaAsuka@sh.itjust.works
            link
            fedilink
            English
            arrow-up
            3
            ·
            1 year ago

            I just hope it works so that people can shut up with the high speed rail only works in other places garbage. Just tell them to go visit california and see how good it is… Only works if they finish it so I hope they do.

    • variaatio@sopuli.xyz
      link
      fedilink
      English
      arrow-up
      6
      arrow-down
      1
      ·
      1 year ago

      Oh wow! In only 6.5 years

      Then again look it this way… Once the lining has been built it will serve California for centuries, just as the original built rail corridors have. The rail tech might change, but the cleared out suitably shallow contoured corridor remains. For centuries.

      • gravitas_deficiency@sh.itjust.works
        link
        fedilink
        English
        arrow-up
        2
        ·
        1 year ago

        I hope you’re right, but having grown up in California, and being very familiar with NIMBY shit there as well as in the northeast… I don’t think you are.

  • HobbitFoot @thelemmy.club
    link
    fedilink
    English
    arrow-up
    15
    ·
    1 year ago

    I really hope they connect to SF or LA soon after. That train is going to be empty without one of those two cities.

    • scarabic@lemmy.world
      link
      fedilink
      English
      arrow-up
      9
      arrow-down
      3
      ·
      1 year ago

      What? It doesn’t go to LA or SF? What is the freaking point? All this will do is encourage more ticky tacky townhomes in the middle of nowhere along Highway 5.

    • Alien Nathan Edward@lemm.ee
      link
      fedilink
      English
      arrow-up
      9
      ·
      1 year ago

      “okay but what if single-occupancy trains where every possible destination has its own train yard that you can pay to leave your single occupancy train in? They would leave on your schedule and go where you’re going.”