• Track_Shovel@slrpnk.netOP
    link
    fedilink
    English
    arrow-up
    5
    ·
    3 months ago

    Depends on the mine. That’s equivalent to a CAT 793, which is their second biggest one. Larger operations can have a fleet of 50 or more trucks. Smaller ones are in the 10-20 range. It all depends on the grade of ore, and how much overburden they need to get out of the way to get to it.

    • MakingWork
      link
      fedilink
      arrow-up
      2
      ·
      3 months ago

      I like the 30 minute charge time. But how many hours does 1 charge last?