• CanadaPlus@lemmy.sdf.org
    link
    fedilink
    English
    arrow-up
    4
    ·
    15 days ago

    Yup, it needs to dry fast enough for the next layer, but not so fast it makes a clog, and it needs to flow in just the right way you can predictably extrude a layer on. And be cheap-ish.

    Of course, you still have to add a lot of non-structural components, like the other user said, and if it needs to take significant loads you also need to add reinforcement somehow, since concrete is weak under tension.

    • bluGill@fedia.io
      link
      fedilink
      arrow-up
      2
      ·
      15 days ago

      You also need to add insulation and then do something to hide the ugly layer lines.