• baconisaveg
    link
    fedilink
    arrow-up
    6
    ·
    10 months ago

    On spec, on time, on budget. Failure to meet those goals is a result of piss poor planning.

    • fidodo@lemmy.world
      link
      fedilink
      arrow-up
      3
      ·
      edit-2
      10 months ago

      Those are all the same attributes, just the planned out version of it where the balance of speed, reliability and cost are decided upon ahead of time.