Stenciling says “6 & 7TH / PDE & 3RD” It’s the only pink tie on this track.

  • perviouslyiner@lemmy.world
    link
    fedilink
    English
    arrow-up
    12
    ·
    edit-2
    11 months ago

    if that was an insulated joint for track circuit separation there would be cables attached at each side and the two bolted plates would be aligned?

    • Darkassassin07
      link
      fedilink
      English
      arrow-up
      12
      ·
      11 months ago

      You can see 3-4 wires connected on either side of the plates.

      I’m not sure if those particular plates are insulating connections though. Doesn’t really look like it, but I’m no expert on rail connections.

      • perviouslyiner@lemmy.world
        link
        fedilink
        English
        arrow-up
        4
        ·
        edit-2
        11 months ago

        good spot, those wires are smaller than I am used to seeing - so it is a track circuit boundary as well as whatever the pink means.