As a huge railfan, I’d say it would make the most sense to ship by rail if they had dozens of trainsets to deliver at once.
They have to load it on a truck anyway to get it from the test track to the switching area a couple kilometres away, then load it off the truck to deliver it. For one or two trains made of 3 parts each, trucking it seems more cost-effective.
As a huge railfan, I’d say it would make the most sense to ship by rail if they had dozens of trainsets to deliver at once.
They have to load it on a truck anyway to get it from the test track to the switching area a couple kilometres away, then load it off the truck to deliver it. For one or two trains made of 3 parts each, trucking it seems more cost-effective.