I’ve just got the hallway plastered gotta get it painted next week.

  • ZombiFrancis@sh.itjust.works
    link
    fedilink
    English
    arrow-up
    1
    ·
    7 hours ago

    Outside: replace collapsing retaining wall of railroad ties with ecology blocks. (Reuse railtoad ties to line planters and walk path.) This is tied with fixing a collapsing fence panel.

    Inside: Tossup between getting an electrician to troubleshoot chronically flickering lights in the master bathroom and closet, and getting the atticspace finished so the garage ceases to be perpetual overflow storage space.