A developer wanted to build a facility to capture carbon. Locals saw an environmental menace.

  • futatorius@lemm.ee
    link
    fedilink
    arrow-up
    1
    ·
    13 days ago

    Look at the actual data. Not all models are equally valid, and in ensemble forecasts from a single model, you need to do a summation of the ensemble members to come up with a firm pseudo-deterministic estimate.