Started a shawl in late January, and it needs to be finished by July. Which, for most people I’m sure that’s nothing but I am a very slow knitter, really!

The pattern is lacy and complicated and mistakes will be really visible, so it’s no good to work on while watching TV or doing anything else and I’d just not been putting time aside to properly concentrate on it.

The solution: A spreadsheet to keep track of how far behind I am, and a graph so I can watch myself (hopefully) catch up.

There are very few problems in life that can’t at least be a bit improved with a spreadsheet, and I reckon that applies to knitting just the same 🤓

  • thegiddystitcher@lemm.eeOPM
    link
    fedilink
    English
    arrow-up
    4
    ·
    9 months ago

    Hah, don’t worry I don’t do this for everything! But I need this one finished by a certain date, and having the hard numbers is very motivational :D