- cross-posted to:
- [email protected]
- cross-posted to:
- [email protected]
Boeing 737 Max planes are grounded after a hole blew in one mid-flight::The FAA ordered that 171 Boeing 737 Max 9 planes be inspected before they can return to service following the explosive decompression of an Alaska Airlines flight.
I’m not sure the queue for the 319, 320 and 321 can get any longer. Airbus simply can’t ramp production and it’s not like the C919 is ready for prime time (yet).
Maybe they can rent some production space in seattle :P
It would be Alabama actually, since you know, labor protections are weak there…
Airbus is ramping up. They have had issues with the supply chain, but they should massively increase their production this year. They are opening assembly lines everywhere.