• 174 Posts
  • 504 Comments
Joined 1 year ago
cake
Cake day: June 12th, 2023

help-circle








  • mondoman712@lemmy.mltoFuck Cars@lemmy.mlRail
    link
    fedilink
    arrow-up
    1
    ·
    11 days ago

    It’s cheaper to run a high speed service than a low speed one. You can transport more people with the same number of staff and trains because it runs faster. The solution isn’t to run an artificially cheaper low speed service along side, it’s to run the high speed service in a sane way.
















    • Merced to Bakersfield is the initial operation segment, that is estimated to cost $28–35 billion, as per your link. This is the cheapest phase that you are referring to.

    • Phase 1 adds the segments to SF and Anaheim. This is projected to cost $130 billion.

    • Phase 2 adds segments to San Diego and Sacramento. These are a long way off and I haven’t seen any cost estimates for it, but as you can see it doesn’t triple the length of the system.

    • There is no Phase 3 in the official design.