• RubberElectrons@lemmy.world
    link
    fedilink
    English
    arrow-up
    6
    ·
    edit-2
    8 months ago

    Saw exactly this when I was doing commissioning for a large municipality. No matter how tight the specs were, some of these knuckleheads would do it their own way and get mad when we forced them to do it right.

    Some of them would just claim bankruptcy if the mistake was big enough.

    Pro-tip, friends: don’t pick the lowest cost of construction bids, I guaran-fucking-tee it’ll cost you more than you saved. And, anyone who says they “meet code” is really saying they do the bare minimum required.