• joshhsoj1902
    link
    fedilink
    arrow-up
    7
    arrow-down
    1
    ·
    1 year ago

    It’s fun seeing someone with so little understanding of electricity spreading the misinformation someone else fed them.

    Most houses existing panel have the capacity for a level 2 charger.

    • Boxtifer@lemmy.world
      link
      fedilink
      arrow-up
      3
      ·
      1 year ago

      100amp or 200amp? I figured a main upgrade will be inevitable with the push to electrify more than the car in houses.

      • joshhsoj1902
        link
        fedilink
        arrow-up
        1
        ·
        1 year ago

        Depends, a 200amp nearly for sure has capacity. A 100amp likely does, but depends how electrified they already are, but many smaller houses that still heat with natural gas will have lots of space left in a 100 amp service

    • schmidtster@lemmy.world
      link
      fedilink
      arrow-up
      1
      arrow-down
      4
      ·
      1 year ago

      Strange, most homes where I live only have 20-50 amp services, neither being enough for a level 2 with all the other required panel loads.

      News flash, codes are different in different places!

      • joshhsoj1902
        link
        fedilink
        arrow-up
        7
        ·
        1 year ago

        20amp service? Lol, ya if you live in an RV park an EV might not be a great option for you.