misk@sopuli.xyz to Technology@lemmy.worldEnglish · edit-220 hours agoMicrosoft cancels some of its AI data center leasestechcrunch.comexternal-linkmessage-square4fedilinkarrow-up163arrow-down13cross-posted to: [email protected]
arrow-up160arrow-down1external-linkMicrosoft cancels some of its AI data center leasestechcrunch.commisk@sopuli.xyz to Technology@lemmy.worldEnglish · edit-220 hours agomessage-square4fedilinkcross-posted to: [email protected]
minus-squareyeehawlinkfedilinkEnglisharrow-up7·19 hours agoI wonder if it’s because they’re making progress on opening up that nuclear reactor again to power their AI needs
minus-squareremer@lemmy.worldlinkfedilinkEnglisharrow-up1·54 minutes agoIt takes years to recommission or build a nuclear plant so this cancellation must involve some other factors.
minus-squaresunzu2@thebrainbin.orglinkfedilinkarrow-up6arrow-down1·17 hours agoOhh the nuclear reactor that DoE provided taxpyer back loan to the operator based on a contract Microsoft might sign with them? Hmmm these parasites never stop leeching.
minus-squareMCasq_qsaCJ_234@lemmy.ziplinkfedilinkEnglisharrow-up1arrow-down1·11 hours agoAre you referring to Helion Energy? Although if we remove the H and the I we have Elon Energy
I wonder if it’s because they’re making progress on opening up that nuclear reactor again to power their AI needs
It takes years to recommission or build a nuclear plant so this cancellation must involve some other factors.
Ohh the nuclear reactor that DoE provided taxpyer back loan to the operator based on a contract Microsoft might sign with them?
Hmmm these parasites never stop leeching.
Are you referring to Helion Energy?
Although if we remove the H and the I we have Elon Energy