- cross-posted to:
- [email protected]
- cross-posted to:
- [email protected]
[T]he report’s executive summary certainly gets to the heart of their findings.
“The rhetoric from small modular reactor (SMR) advocates is loud and persistent: This time will be different because the cost overruns and schedule delays that have plagued large reactor construction projects will not be repeated with the new designs,” says the report. “But the few SMRs that have been built (or have been started) paint a different picture – one that looks startlingly similar to the past. Significant construction delays are still the norm and costs have continued to climb.”
deleted by creator
The fact that this was your take away is concerning.
No government service should have to show a profit. If it’s an essential service, then it needs to be done. The only time money should come into it is in regular audits to ensure the budget is being used efficiently.
Yup, the military’s purpose is to not be needed. It should be strong enough to deter attack and assist diplomacy (carrot and stick), and no larger. Our (US) military is bigger than that, so it gets used in place of diplomacy.