- cross-posted to:
- canada
- cross-posted to:
- canada
cross-posted from: https://lemmy.world/post/15520203
Months after cancelling the construction contract for a new downtown pedestrian bridge in the face of “unforeseen challenges,” city officials have called off the project altogether.
As stated in a post on the city’s website on Friday, plans to build a bridge over the Speed River connecting The Ward with Downtown Guelph have been scrapped. Instead, city officials will look for ways to include pedestrian flow into another nearby project over the river.
You must log in or # to comment.