• OminousOrange
    link
    fedilink
    arrow-up
    10
    arrow-down
    1
    ·
    6 months ago

    It starts early in the design process. But at that stage, it would be best to pause installation, have a mechanical engineer do the mechanical design (including equipment selection) based on an energy model and install the recommended equipment.