• Kelsenellenelvial
    link
    fedilink
    arrow-up
    2
    ·
    10 months ago

    36 day month is just as arbitrary to me as having 28-31 days per month though, and do you make a week 6 days to fit the length of a month, or keep it at 7 since it doesn’t really evenly divide into current months(aside from February 3/4 years), anyway and then those extra 5-6 still messes up the rotation. National holiday sounds good if you’re doing the kind of work that can be put off for the week, but becomes a pain for business that need to keep running through holidays, particularly a holiday that lasts more than 2 days. Lots of our economy is based on things like standard work weeks/months, billing on monthly basis, etc… At best I think we could shuffle a couple days from the 31 day months to February so it’s more consistent, or make them all 30 and make things like solstices/equinoxes/new years day be the extra 5 tacked on to (or between, but consider it part of the month for purposes like monthly billing) the appropriate months. Lots of disruption for minimal gains though.

    Really, we have the second defined well in SI, and there’s no real reason we couldn’t just use that with the usual prefixes for things that don’t need to correlate with the calendar. When we get to the point of colonizing other worlds then there’s an argument to make some consistent standard to accommodate each world having a different solar day/year but as long as pretty much everybody hangs out on Earth I just don’t see any significant benefit to trying to metricize timekeeping.

    • Hamartiogonic@sopuli.xyzOP
      link
      fedilink
      English
      arrow-up
      1
      ·
      10 months ago

      I understand the desire for mathematical beauty, but the real world is messy, inconsistent, somewhat random and constantly drifting. There is no good solution to a problem like this, and that’s why my first proposal was to remove months entirely and just count the number of days instead.

      The current 7 day week is pretty good IMO, so there’s no urgent need to mess with that. However, if you want all the numbers to align beautifully, 7 not a very nice number for that. If you change that, you would still need to figure out how do you put rest days somewhere in there, and that’s when it’s going to get really messy.

      That billing thing is a good point, so having agreed upon periods of some sort would be beneficial. If we have months of some sort, then we should use those. If we just count days instead, then billing could happen every 20 days or whatever number you happen like.

      When it comes to SI prefixes and seconds, I would love to see engineers and scientists count things in ks, Ms, Gs etc. If people do this all the time, they would probably memorize important values like a work day is about 28.8 ks or a lunch break takes about 1.8-3.6 ks etc. If you’ve estimated that your experiment is going to last 33 ks, it’s going to require two shifts from your research team. If your shorter experiment can be left unsupervised for 4 ks, then that would be the best time for lunch.