• RandAlThor
    link
    fedilink
    arrow-up
    3
    ·
    2 hours ago

    No. Oil and gas are very hard to ship. Canadian oil is of heavy type which most of the world doesn’t use. Gas needs LNG terminals and we simply haven’t built. EU has been urging Canada to build some in Quebec and Maritimes so they can reduce dependence on Russia. Most of the pipelines go to the US south for refining - in Louisiana and Texas. Canadian producers have no choice but to sell to them, at whatever they want to pay. That’s why Alberta was bitching and moaning about building the pipeline to BC so that they can get a better price for their heavy oil elsewhere and Trudeau spent billions to appease them but that pipeline’s been in limbo.

    • CanadaPlus@lemmy.sdf.org
      link
      fedilink
      arrow-up
      2
      arrow-down
      1
      ·
      edit-2
      2 hours ago

      Tank trucks exist, they’re just more expensive, which is why pipelines have been on the agenda. We also have upgraders that make heavy oil light - I’ve seen some desulfering plants in person (yes, I’m in this picture, if only geographically). It’s a distillation away from being petrol (and heavy/heating oil and asphalt), and the main cost of shipping is petrol, so the economic case is really just driven by the need for it at the other end.

      Meanwhile, in Ontario a part crosses the border multiple times on it’s way to being generally saleable as a car, and would rack up 25% every time as the policy is currently proposed. You’re right, Alberta will be in the shitter economically, but we’re not the most vulnerable, let alone the most vulnerable by far.

      • RandAlThor
        link
        fedilink
        arrow-up
        2
        ·
        1 hour ago

        Two problems with your suggestion: 1)not enough truck drivers, nor trucks to move that kind of volume (this has existed for nearly 2 decades and getting worse - google it). 2) refining CAPACITY isn’t sufficient or they would already be doing what you’re suggesting. Upgraders, refiners are UBER EXPENSIVE to build, and NO CAPITALIST is investing in new refining capacity for the last 10 years. This is why most of the refining is done where it’s already built.